Val di Pai deck assembly
In these days is taking place the assembly of the deck in Val di Pai Cable Stayed Bridge: 118 m span on a 100 m deep valley, one inclined concrete mast, and a minimum jobsite space, crossed by an open to traffic road on a steep of the Italian Alps.
A logistic challenge and an acrobatic construction!